Concrete Formwork:
Concrete Design Solutions
Developed by Shaw/Stewart, the EZ-STACK™ Wall Form system is the most versatile and user-friendly modular panelized gang form system available. Shaw/Stewart’s concrete framework solutions have been used on the following projects:
Minneapolis Public Library - designed by César Pelli
General Contractor: Graham/Penn-Co Construction
Vertical formwork for 7 separate Elevator and/or Stairway Cores
The architect had specified Architectural “Class A” concrete finish on all vertical wall surfaces, painted or less final appearance, specified tie locations & hole size & shape
Solution: custom built panels with premium overlay
Limited crane capacity at 2 of the 7 cores
Solution: light form weight
Predetermined horizontal construction joints with varying pour heights ranging from 10'- 24'
Solution: easily modified wood forms
Winter conditions & temp heating for strength specifications
Solution: preinsulated formwork
Burnsville Center for Performing – Burnsville, MN
Concrete Contractor: Kelleher Construction
Formwork for 80' freestanding SoundStage
80' freestanding stage straight up in 5 lifts.
Solution: used rollback system, jump system for accessibility and safety
Limited worksite access limited crane size
Solution: Lightweight forms easily accommodated limited crane capacity
Winter conditions
Solution: Preinsulated forms, reduced temporary heating costs
Kinnick Stadium
General Contractor: Knutson (Iowa Division ) Construction Services
Foundation & Tunnel Forms
Complicated foundation plan & shape with integral column pilasters
Solution: Custom-built, reversible pilaster forms accelerate production schedules, reduced labor costs
Empire Wastewater Treatment Plant
General Contractor: Knutson Construction Services
Formwork for Main Areation Tank & Headworks Building
Winter conditions & temp heat expense, specs required a 7 day curing cycle
Solution: preinsulated, additional square footage formwork
Extremely large footprint and work area required multiple tower crane placements
Solution: lightweight EZ Stack panels reduce workload to one tower crane
Benson Biomass, Main Fuel Hall Facility
Contractor: Knutson Construction Services
Varying wall heights from 27’ deep to 54’ deep
Solution: EZ Stack modular panels easily reconfigure to accommodate height variations